Commit Graph
4 Commits
Author SHA1 Message Date
thanhnv e79d7973fb Complete CASAN backlog tier 1 controls 2026-07-06 11:31:17 +09:00
thanhnvandClaude Opus 4.8 2af67ef6a5 docs: re-score from a real full run (155/0) after H5 hardening
Ran all 7 suites sequentially on 2026-07-04 @ 00aabfa with Vault dev live so KMS
runs (not skips): run-casan4 35 · adversarial 44 · phase1-track-a 25 ·
phase2-track-c 29 · phase3-evidence 7 · phase-h5-approval 8 · phase-h5-infra 7
= 155 PASS / 0 FAIL; security-gate PASS=11 FAIL=0.

- scoring-run-report.md: fair re-score — H5 76→80 (approval-identity + KMS live
  rotate/non-exportable + WORM), lowest harness now H6=79, avg ~80.7/100, Level 4.
  Evidence lists the live KMS + WORM results.
- CASAN_HARDENING_STATUS.md: new Phase 4 (C4 approval-identity, B3 KMS, C5 WORM =
  implemented+tested); test inventory 140→155 (7 suites); planned→partial for
  KMS/approval/WORM with honest remaining gaps (live IdP, S3 WORM store, KMS default).
- Plan-07 §2: key-mgmt 2.5→4, policy-approval 2.5→4, external-audit 1.5→3.5;
  header now H5 76→80, lowest harness H6.
- INDEX row, README claim boundary, video-guide Q&A: 155 checks, H5=80, lowest H6=79.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-04 23:51:50 +09:00
thanhnvandClaude Opus 4.8 4cc78f74eb docs: honest hardening status + claim boundary (Plan-07 A/C-MVP, Plan-09)
- CASAN_HARDENING_STATUS.md: canonical implemented/scaffold/planned record with
  per-control test mapping and test inventory (baseline 79 + 61 new = 140 checks).
- README claim boundary: separate implemented+tested controls from planned;
  explicitly does NOT claim full production-readiness (Track B, C-Gov/Ops, true
  sandbox isolation, IdP/WORM still planned).
- INDEX status table: Plan-07 Track A + C-MVP done, Plan-09 MVP done.
- video guide: core demo battery counts unchanged (hardening lives in separate
  suites); added deep-dive commands + 3 Q&A rows + sandbox honesty note.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-03 23:07:31 +09:00
thanhnvandClaude Opus 4.8 fbcef967e5 chore(freeze): snapshot demo state before Plan-07 hardening work
Freeze current submission/demo baseline:
- casan-next-plans/: full task-level plan set (Plan 00 index + 02/04/06/07/08/09/12, QA, slide deck)
- optimize-docs/video-steps/: per-vector scene breakdown (commands/screen-text/script) + start-tmux
- run-all.sh / scorecard.sh / map-live.sh: REAL=1 live-battery wiring
- regenerated evidence + audit/telemetry logs from live REAL=1 run
- submission README + video recording guide updates
- dry-run pipeline logs for 001-okr-web-app

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-03 22:03:44 +09:00