Commit Graph
12 Commits
Author SHA1 Message Date
thanhnv c800f7edf7 feat: harden chat state by tenant 2026-07-08 23:38:22 +09:00
thanhnv b3b0544ba8 feat: certify codegen chat drafts through loop 2026-07-08 23:20:54 +09:00
thanhnv 780fe86273 feat: escalate chat approvals through inbox 2026-07-08 23:09:43 +09:00
thanhnv a029a51e72 feat: add command center chat loop widget 2026-07-08 22:58:02 +09:00
thanhnv 36af576f15 feat: add chat replay verification 2026-07-08 22:45:12 +09:00
thanhnv 49d0363c6a feat: certify chat operator turns through loop-run 2026-07-08 22:31:03 +09:00
thanhnv 004afa73c9 feat: add governed chat agent selection 2026-07-08 22:19:51 +09:00
thanhnv 5561bcf864 feat: add governed chat console 2026-07-08 21:14:40 +09:00
thanhnv 3be9970c15 feat: add control panel 2026-07-08 19:07:35 +09:00
thanhnvandClaude Opus 4.8 a07b15e489 docs(plans): Plan-13 Track 1 (read-only Ops Console) marked done in status trackers
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-08 17:28:35 +09:00
thanhnvandClaude Opus 4.8 4918012199 docs(plans): sync roadmap status + paths to post-restructure state
- Plan-01 marked ✅ DONE (INDEX table + P3 tier + BACKLOG row + plan header).
- Plan-06 / Plan-12 dependency on 01 satisfied → 🔓 unblocked (headers + BACKLOG rows).
- Repoint command/path refs in all plans (except Plan-01's migration narrative):
  .specify/{scripts,tests,security,config,templates,governance} -> packages/casan-harness/...;
  golden-runs/traceability-map/docs-input -> apps/okr/domain/...; `cd AINative_OKR_CASAN5`
  -> `cd $(git rev-parse --show-toplevel)`; fix relative links + Plan-13 control-plane location.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-08 14:57:01 +09:00
thanhnvandClaude Opus 4.8 fa3dd94c76 docs: restore casan-next-plans roadmap into docs/plans (was wrongly deleted)
The plan set (Plan-00..18, backlog/hardening/QA status, team allocation) is the ONGOING
roadmap, not a finished competition artifact — restored from history into docs/plans/.
Plan-01 (restructure) marked ✅ done; the rest remain to do.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-08 14:46:50 +09:00