Commit Graph
4 Commits
Author SHA1 Message Date
thanhnvandClaude Opus 4.8 2ffbda3fad feat(video+deck): Part 2 hardening demo script + slide deck update
- run-hardening.sh: narrated "Part 2" battery in the same visual language as
  run-all.sh (card/attack/guard/cmd + on-screen exit code with ⛔/✋/✅ verdict
  chips). Scenes: Track A (HA1-7: homoglyph/zero-width/base64, strict fail-closed,
  telemetry tamper, cost slow-boil/spray, benign FP=0%), Track C-MVP (HC1-4:
  action-gate, supply-chain, data-exfil, sandbox), and the Evidence Pack
  money-shot (HE1-4: pack → verify VALID → tamper 1 byte → TAMPERED exit=1 →
  certified-only-when-earned). Verified end-to-end (exit 0).
- CASAN_SLIDE_DECK.html: reflect implemented vs planned honestly. Updated H4/H5/H6
  AFTER columns, evidence terminal (140 checks), threat-model reframed to
  "identified AND Track A closed", readiness meters bumped to ~3.8-4.0, Track C-MVP
  reframed to DELIVERED (29/29), roadmap marks 07+09 done. Added 2 slides:
  "Track A delivered" and "Evidence Pack money-shot" (18 slides total).
- video guide: Part 1 (run-all) + Part 2 (run-hardening) with pre-flight note.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-03 23:51:11 +09:00
thanhnvandClaude Opus 4.8 4cc78f74eb docs: honest hardening status + claim boundary (Plan-07 A/C-MVP, Plan-09)
- CASAN_HARDENING_STATUS.md: canonical implemented/scaffold/planned record with
  per-control test mapping and test inventory (baseline 79 + 61 new = 140 checks).
- README claim boundary: separate implemented+tested controls from planned;
  explicitly does NOT claim full production-readiness (Track B, C-Gov/Ops, true
  sandbox isolation, IdP/WORM still planned).
- INDEX status table: Plan-07 Track A + C-MVP done, Plan-09 MVP done.
- video guide: core demo battery counts unchanged (hardening lives in separate
  suites); added deep-dive commands + 3 Q&A rows + sandbox honesty note.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-03 23:07:31 +09:00
thanhnvandClaude Opus 4.8 fbcef967e5 chore(freeze): snapshot demo state before Plan-07 hardening work
Freeze current submission/demo baseline:
- casan-next-plans/: full task-level plan set (Plan 00 index + 02/04/06/07/08/09/12, QA, slide deck)
- optimize-docs/video-steps/: per-vector scene breakdown (commands/screen-text/script) + start-tmux
- run-all.sh / scorecard.sh / map-live.sh: REAL=1 live-battery wiring
- regenerated evidence + audit/telemetry logs from live REAL=1 run
- submission README + video recording guide updates
- dry-run pipeline logs for 001-okr-web-app

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-03 22:03:44 +09:00
thanhnv 07ac1bdcdd update first - 84 2026-06-30 02:21:39 +09:00