Commit Graph
28 Commits
Author SHA1 Message Date
thanhnv 8b477f3800 QA and context compress 2026-07-29 18:53:08 +07:00
thanhnv 0cc43d94d3 plan: update plan20 2026-07-22 00:20:12 +07:00
thanhnv 9785e13c82 feat: export aggregate Prometheus metrics 2026-07-18 09:25:56 +07:00
thanhnv 083a1de875 docs: add external security review engagement scope 2026-07-18 09:21:42 +07:00
thanhnv e50714d622 feat: add tenant isolation pre-audit evidence 2026-07-18 09:04:39 +07:00
thanhnv 36158c5e34 docs: add certification and audited operations roadmap 2026-07-18 00:22:52 +07:00
thanhnv 2783a21338 docs: add Japanese production support escalation draft 2026-07-18 00:22:18 +07:00
thanhnv 8a676f0ad4 docs: add APPI data processing assessment template 2026-07-18 00:21:36 +07:00
thanhnv b921f25c57 feat: require rootless production sandbox runners 2026-07-18 00:19:53 +07:00
thanhnv 92c20e304c ci: publish verified evidence packs from Gitea runs 2026-07-18 00:18:36 +07:00
thanhnv 407d373b4e feat: gate upgrades with compatibility matrix 2026-07-18 00:17:45 +07:00
thanhnv d129ba60ef fix: require Vault audit signing in production 2026-07-18 00:15:38 +07:00
thanhnv 00963119f4 feat: add verified state backup and restore drill 2026-07-18 00:14:22 +07:00
thanhnv 881ee01691 feat: prepare CASAN paid PoC release package 2026-07-18 00:07:04 +07:00
thanhnv d882a9dc23 feat: plan 18 2026-07-10 11:28:14 +09:00
thanhnv fafccc47ad feat: complete llm sourcegen plan 2026-07-09 00:59:28 +09:00
thanhnv c800f7edf7 feat: harden chat state by tenant 2026-07-08 23:38:22 +09:00
thanhnv b3b0544ba8 feat: certify codegen chat drafts through loop 2026-07-08 23:20:54 +09:00
thanhnv 780fe86273 feat: escalate chat approvals through inbox 2026-07-08 23:09:43 +09:00
thanhnv a029a51e72 feat: add command center chat loop widget 2026-07-08 22:58:02 +09:00
thanhnv 36af576f15 feat: add chat replay verification 2026-07-08 22:45:12 +09:00
thanhnv 49d0363c6a feat: certify chat operator turns through loop-run 2026-07-08 22:31:03 +09:00
thanhnv 004afa73c9 feat: add governed chat agent selection 2026-07-08 22:19:51 +09:00
thanhnv 5561bcf864 feat: add governed chat console 2026-07-08 21:14:40 +09:00
thanhnv 3be9970c15 feat: add control panel 2026-07-08 19:07:35 +09:00
thanhnvandClaude Opus 4.8 a07b15e489 docs(plans): Plan-13 Track 1 (read-only Ops Console) marked done in status trackers
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-08 17:28:35 +09:00
thanhnvandClaude Opus 4.8 4918012199 docs(plans): sync roadmap status + paths to post-restructure state
- Plan-01 marked ✅ DONE (INDEX table + P3 tier + BACKLOG row + plan header).
- Plan-06 / Plan-12 dependency on 01 satisfied → 🔓 unblocked (headers + BACKLOG rows).
- Repoint command/path refs in all plans (except Plan-01's migration narrative):
  .specify/{scripts,tests,security,config,templates,governance} -> packages/casan-harness/...;
  golden-runs/traceability-map/docs-input -> apps/okr/domain/...; `cd AINative_OKR_CASAN5`
  -> `cd $(git rev-parse --show-toplevel)`; fix relative links + Plan-13 control-plane location.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-08 14:57:01 +09:00
thanhnvandClaude Opus 4.8 fa3dd94c76 docs: restore casan-next-plans roadmap into docs/plans (was wrongly deleted)
The plan set (Plan-00..18, backlog/hardening/QA status, team allocation) is the ONGOING
roadmap, not a finished competition artifact — restored from history into docs/plans/.
Plan-01 (restructure) marked ✅ done; the rest remain to do.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-08 14:46:50 +09:00