Commit Graph
2 Commits
Author SHA1 Message Date
thanhnvandClaude Opus 4.8 d8583fdb2e docs(plan-07): re-score §2 readiness table after Track A + C-MVP + Evidence Pack
Update the 0–5 production-readiness table with Baseline → Nay per dimension and
point to the fair 0–100 report. Trio H4/H5/H6 ~3.0 → ~3.7/5 (per-harness fair
score 76–80/100); Track C dims lifted (tool-authz 2→4, supply-chain 1→3.5,
data-exfil 2→4, sandbox 1→2.5 scaffold, +Evidence Pack 4). Governance/Ops
(C4/C5/C7) still 1–2.5 [planned]. Honest headline: ~80/100 avg, lowest H5=76,
CASAN Level 4 at threshold. Source: evidence/scoring-run-report.md.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-04 22:56:03 +09:00
thanhnvandClaude Opus 4.8 fbcef967e5 chore(freeze): snapshot demo state before Plan-07 hardening work
Freeze current submission/demo baseline:
- casan-next-plans/: full task-level plan set (Plan 00 index + 02/04/06/07/08/09/12, QA, slide deck)
- optimize-docs/video-steps/: per-vector scene breakdown (commands/screen-text/script) + start-tmux
- run-all.sh / scorecard.sh / map-live.sh: REAL=1 live-battery wiring
- regenerated evidence + audit/telemetry logs from live REAL=1 run
- submission README + video recording guide updates
- dry-run pipeline logs for 001-okr-web-app

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-03 22:03:44 +09:00