chore(freeze): snapshot demo state before Plan-07 hardening work

Freeze current submission/demo baseline:
- casan-next-plans/: full task-level plan set (Plan 00 index + 02/04/06/07/08/09/12, QA, slide deck)
- optimize-docs/video-steps/: per-vector scene breakdown (commands/screen-text/script) + start-tmux
- run-all.sh / scorecard.sh / map-live.sh: REAL=1 live-battery wiring
- regenerated evidence + audit/telemetry logs from live REAL=1 run
- submission README + video recording guide updates
- dry-run pipeline logs for 001-okr-web-app

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
thanhnv
2026-07-03 22:03:44 +09:00
co-authored by Claude Opus 4.8
parent fabd5f8783
commit fbcef967e5
182 changed files with 3865 additions and 341 deletions
+1 -1
View File
@@ -2,7 +2,7 @@
## One-Line Positioning
We upgraded the SDD Speckit OKR pipeline from CASAN Level 3/4 transition to **CASAN Level 4 achieved** and **Level 5 demonstrated locally with verifiable controls**.
We upgraded the SDD Speckit OKR pipeline from the CASAN Level 3→4 transition to **CASAN Level 4 — proven by attack**: H4/H5/H6 (former GAPs 20/25/30) now defeat ~23 live adversarial vectors with on-screen exit codes. Level 5 is stated as **roadmap** (IdP, WORM log storage, provider-telemetry API, hosted dashboard) — not claimed as achieved.
## Open These First