update first - 84

This commit is contained in:
thanhnv
2026-06-30 02:21:39 +09:00
commit 07ac1bdcdd
561 changed files with 88164 additions and 0 deletions
@@ -0,0 +1,47 @@
# AI Context README
Use this file when asking another AI or teammate to inspect the submission.
## Goal
Prepare a HarnessAthon submission that proves:
- CASAN Level 4 achieved.
- CASAN Level 5 demonstrated locally with verifiable evidence.
## Main Project
`../AINative_OKR_CASAN5`
## Fast Verification
```bash
cd ../AINative_OKR_CASAN5
bash .specify/tests/run-casan4-harness-tests.sh
```
## Important Paths
| Area | Path |
|---|---|
| H4/H5/H6 scripts | `.specify/scripts/bash/` |
| Level 5 configs | `.specify/level5/` |
| CASAN reports | `docs/output/casan/` |
| Demo pipeline context | `docs/output/output_logs/casan-demo/pipeline-context.yaml` |
| Test runner | `.specify/tests/run-casan4-harness-tests.sh` |
| Submission package | `../00_SUBMISSION_PACKAGE` |
## Review Priority
1. Verify tests pass.
2. Check `policy-private.pem` is not in the zip.
3. Check evidence map.
4. Check deck and video guide.
5. Challenge the Level 5 claim boundary.
## Claim Boundary
Do not overclaim full enterprise production Level 5. Say:
> Level 4 achieved. Level 5 demonstrated locally with verifiable controls. Enterprise production requires IdP, WORM storage, live provider telemetry, and hosted dashboard integration.