update first - 84

This commit is contained in:
thanhnv
2026-06-30 02:21:39 +09:00
commit 07ac1bdcdd
561 changed files with 88164 additions and 0 deletions
+52
View File
@@ -0,0 +1,52 @@
# HarnessAthon Submission Package
## One-Line Positioning
We upgraded the SDD Speckit OKR pipeline from CASAN Level 3/4 transition to **CASAN Level 4 achieved** and **Level 5 demonstrated locally with verifiable controls**.
## Open These First
1. `presentation/HarnessAthon_CASAN_Level5_Demo.pptx`
2. `docs/00_task_breakdown.md`
3. `docs/01_submission_checklist.md`
4. `docs/02_pitch_script.md`
5. `docs/03_judge_qna.md`
6. `docs/04_evidence_map.md`
7. `video/01_video_recording_guide.md`
8. `ai_context/AI_README.md`
## Main Evidence
| Evidence | Source |
|---|---|
| Harness test report | `../AINative_OKR_CASAN5/docs/output/casan/evidence/harness-test-report.md` |
| CASAN assessment | `../AINative_OKR_CASAN5/docs/output/casan/casan-level4-assessment.md` |
| Before/after scorecard | `../AINative_OKR_CASAN5/docs/output/casan/before-after-scorecard.md` |
| Demo pipeline context | `../AINative_OKR_CASAN5/docs/output/output_logs/casan-demo/pipeline-context.yaml` |
| Central dashboard | `../AINative_OKR_CASAN5/docs/output/casan/central-agentops-dashboard.html` |
| Final zip | `../AINative_OKR_CASAN5.zip` |
## Folder Purpose
| Folder | Purpose |
|---|---|
| `docs/` | Checklist, pitch script, judge Q&A, evidence map, AI-optimized structure notes |
| `presentation/` | PPT deck and deterministic generation source |
| `video/` | Screen-recording guide and narration outline |
| `evidence/` | Evidence index pointing to canonical generated evidence |
| `ai_context/` | One-page context for AI/teammate review |
## Verification Command
```bash
cd ../AINative_OKR_CASAN5
bash .specify/tests/run-casan4-harness-tests.sh
```
Expected: all PASS, including H4/H5/H6 and Level 5 evidence checks.
## Claim Boundary
- CASAN Level 4: achieved.
- CASAN Level 5: demonstrated locally with signed policy, provider telemetry import, shared harness registry, fallback, drift detection, rollback, KPI feedback, and central dashboard.
- Enterprise production Level 5 still needs live IdP, WORM storage, live provider API integration, and hosted dashboard.